1. Welcome to 28DaysLater.co.uk - 28DL - The UK Urban Exploring / Urban Exploration / Urbex Forums.

    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections plus a lot more.

    Please feel free to browse this website as a guest. Creating an account removes some ads, allows you to post replies, start new topics and threads, and gives you access to more features including bookmarking, live chat, messaging and notification systems.

    Create an account | Login | Request new password

Report - Farleigh Down Tunnel. March 2014

Discussion in 'Underground Sites' started by wellingtonian, Mar 31, 2014.

  1. wellingtonian

    wellingtonian Subterráneo
    Regular User

    Joined:
    Apr 21, 2013
    Messages:
    956
    Likes Received:
    426
    Farleigh Down Tunnel​


    Visited with tumbles, WhoDaresWins and Seffy on a beautiful sunny day. It was our second site of the day, on our Bristol meet tour.

    Having rocked up here a few weeks ago to find it sealed, we weren't entirely surprised to find it open again, and decided to make the most of the opportunity.

    Some history shamelessly lifted from subbrit

    Monkton Farleigh ammunition depot utilised an old stone quarry below a plateau some 450 feet above the valley floor in which ran the main line railway that was its principal source of supply. Before the depot could be commissioned, an efficient means was need to bring in ammunition from the railway at Farleigh Down Sidings. The sidings were just over a mile from the depot as the crow flies but more than four miles by road along steep and tortuous country lanes.

    The tunnel was designed to handle 1000 tons of ammunition daily. This was not scheduled for completion until 1941.

    The tunnel to the railway sidings at Shockerwick was a key feature of Monkton Farleigh mine, offering a secure route, invisible to aerial reconnaissance. The tunnel terminated at a loading platform thirty feet below ground level at a right angle to the main-line platform. The design was finalised in December, 1938, and by the end of the following year the upper terminus was completed. Boring the one-and-a-quarter-mile-long tunnel was a specialist task completed under contract by the Cementation Company. The tunnel runs from quarry floor level near Main West to the underground loading platform near the main line railway at a constant gradient of 1:81/2. Deep tunnelling was required for the top half of the route whilst the lower half is at or just below ground level and was constructed by the `cut and cover' method. A depth of 180 feet was reached near the edge of the Farleigh Down escarpment.

    So this is where the sidings from the main railway line were, and the slope shaft down to the loading area.


    [​IMG]


    [​IMG]


    [​IMG]


    At the bottom, the tunnel turns left through 90 degrees to this area


    [​IMG]


    [​IMG]


    Archive photo


    [​IMG]


    This is the start of the conveyor tunnel


    [​IMG]


    The first part is box section concrete


    [​IMG]


    Which changes to arched brickwork, painted white in true army style


    [​IMG]


    [​IMG]



    Yes we did reach the end......... not quite as exciting as it might have been......... but erosion is occurring!!

    Bloody calves were on fire by the time we re emerged..

    Headed to the pub for much needed sustenance, before we hit some more sites.

    Great day once again with the Brizzle crew.

    Cheers for looking :)
     

    Remove this ad by donating or subscribing.

  2. The Kwan

    The Kwan funksoul Brother
    Regular User

    Joined:
    Mar 28, 2011
    Messages:
    1,669
    Likes Received:
    666
    Looks brilliant this Wellie man :), good pictures and the pub ftw :thumb
     
  3. tumbles

    tumbles Trip Hopping
    Regular User

    Joined:
    Jul 20, 2007
    Messages:
    789
    Likes Received:
    271
    Home Page:
    Good stuff mate, my legs wobble just at the thought of that hike again :D
     
  4. Lenston

    Lenston Bajo Tierra
    Regular User

    Joined:
    Mar 9, 2013
    Messages:
    1,486
    Likes Received:
    733
    Some nice shots there mate :thumb
     
  5. Ojay

    Ojay Admin
    Staff Member Admin

    Joined:
    Nov 24, 2008
    Messages:
    4,837
    Likes Received:
    1,524
    Someone been down with the gas axe then :D
     
  6. Seffy

    Seffy Bally up lads!
    Regular User

    Joined:
    Feb 23, 2011
    Messages:
    951
    Likes Received:
    282
    Home Page:
    ^^ They'd done a proper job on this, that's for sure...

    Nice one N, glad to see a report from this trip going up too :thumb
     
  7. Walrus75

    Walrus75 28DL Full Member
    28DL Full Member

    Joined:
    Jan 8, 2007
    Messages:
    34
    Likes Received:
    2
    And the track of which is quite obvious, in aerial view on Bing Maps nowadays, as a pale mark across the ploughed fields . Good job the Jerries didn't have it back then :D
     
  8. paulpowers

    paulpowers Massive Member
    Regular User

    Joined:
    Jun 15, 2011
    Messages:
    1,343
    Likes Received:
    737
    Hahaha that was sealed for long

    Good stuff there, and you got some nice crisp images
     
Draft saved Draft deleted
Loading...

Users Who Have Read This Thread (Total: 0)

Share This Page

Remove this ad by creating an account and logging in