I just don't know where to start with this. I thought when we did Weston Point back in May it was about the peak of 'power station exploring' for the year but after this place im not so sure. It all started with a recce on an interesting looking building, no real expectations, then it just kept (and still keeps) coming. I returned this weekend for about the 6th time and was totally blown away by what we found yet again. Whoever decided to try and drive a wedge between Dereliction UE and Infrastructure UE needs their head examining!

6531800791_20bb855d29_o.jpg

Wikipedia can provide an overview of the history of the stations that have existed on this site. Dont confuse this with Barking Reach gas fired station which is quite a way further east near the Dagenham Ford plant.

wikipedia said:
Barking A power station

Prior to the construction of Barking A Power Station, Barking Urban District Council had operated its own small power station near to their offices since 1897. This station operated until 1927.[1] The County of London Electric Supply Company applied for permission to build a power station capable of expansion to 600,000 kilowatts, at Barking in 1920.[2] They opened Barking Power Station at Creekmouth in 1925. In 1927 it took over from the Barking Urban District Council station, to provide a bulk electricity supply.[1] When completed the A station was the largest power station in Britain to be built as a complete station at one time.

The site it was built upon was chosen for easy delivery of coal from the Thames and by rail, as well as the abundant water supply and space on the site for expansion.[1] A cable tunnel was constructed under the river to supply the south bank with electricity.[3]
[edit] Barking B power station

Barking's original 'A' station was extended by the building of 'B' station, which began to operate at full capacity in 1939. The power station was transferred to the London Division of the British Electricity Authority in 1948.[1] The B station closed on 15 March 1976 with a generating capacity of 144 megawatts.[4]
[edit] Barking C power station

The British Electricity Authority built a third station at Creekmouth, which was completed in 1954. The station was closed on 26 October 1981 with a generating capacity of 220 MW.[4] All three stations have since been demolished.


As you can see it states 'All three have now been demolished'.. Well yes the boiler houses and turbine halls are long gone. The site is now in use for self storage depots and even the Barking Sunday market but as with many old CEGB sites all is most defiantly not lost!

Lets try and split this up into a few sections.

The 33kv Substation

This was our initial port of call. Its easy to spot being close the the road and fairly easily accessed being part of the market site rather then the container yard next door. Its not the only substation left on the site but it is the most obviously 'derelict' building. First trip was an evening recce. At first we were pleasantly surprised to find simply 'something' inside. The building was a true relic of the CEGB days with crazy enamel signs, a nice battery room and a very nice Mather and Platt sprinkler system still in situe. Poking around we had the first moment of epicness. Peering down through holes in the floor where cables once ran we were met with the warm glow of sodium light shining back up at us.. This place had tunnels! and what did we find on the wall? yep a bloody map of them!! (with access and egress points clearly marked no less!) of course it wasnt going to be that simple was it.. All access points were concreted. I scoured the floors of the building for hours before 'epic moment number two' reared is head and provided an ignorable distraction..

As we approached the end of the building i stepped outside and on the wall above, just about at the limit of my finger tip reach there was a door ever so slightly ajar. I strained to reach and getting my finger tips around the corner managed to swing it open. Two steps taken back, i fumble for the torch and without being too obvious shine it up though to doorway. We had found what we came for!!! CONTROL ROOOOOOM!!!!!

6530379789_6854d45f7e_z.jpg


6530400009_f9b74b65fd_z.jpg


6530390001_d178a0e39b_z.jpg


6530391779_ea5b5f24c5_z.jpg


6530388289_727dcf1855_z.jpg


6530386529_193b506fdb_z.jpg


6530384917_504127caf8_z.jpg


6530381679_3e3f995565_z.jpg


6530393713_261417f47f_z.jpg


6530397769_f703e42de2_z.jpg


6530348709_9465a05f9a_z.jpg


6530401245_3b1d5db042_z.jpg



6530357245_b8da5ef27e_z.jpg
6530351157_7f1d0265c8_z.jpg


6530349575_0fe8dfffa4_z.jpg


6530355169_0535da800b_z.jpg


 
Last edited:

Speed

Got Epic?
Regular User
Re: Barking Powerstation and Cable Tunnel Network - Sept to Dec 2011

The Control Room and Office Block

Now.. i hear what your saying! didnt we just have the control room?? well no.. you had A control room. Not THE control room. Now on the third visit. Remember that tunnel map from the first? Yep you probably noticed to too! 'CONTROL ROOM AND OFFICE BLOCK' well this was our next target and things started to get a little more tricky. This building was once the main entrance, offices and control room for the whole of A and B station not just a poncy little 33kv substation! you can imagine we were a little keen to see what was in there. Blocking our path was some kind of cockney pikey death gauntlet of men in transit tippers and barky illegal dog breeds. Verdict. Not do able in the daytime, not if you value your health anyway! First we tired asking, didn't work, man just let us look through the window at the tantalising ceiling! Going at dawn was the only real way to get a decent look and a decent set of pictures but it didn't leave much of a window. By now it was late October and the clocks were about to change giving that valuble extra hour of daylight that was needed to get in, explore and get out before the men arrived and blocked my escape.

Im not sure if i was disappointed by what was inside.. i dont think its really possible to be disappointed after stumbling on a place like this but it was a bit of a knock back to find the control panels had been removed. High hopes we dashed slighly.. that was until we found a way into the basement.. FUCK its happening again! Expectation was an empty set of rooms. Reality was a basement CRAMMED with gear! WW2 stencils on the wall, more epic switches, signs and gauges then you can shake a stick at all old as fuck!


6530290997_5995fca8ed_z.jpg


6530294823_c947aea964_z.jpg


6530303747_3294bee087_z.jpg
6530292915_d347f762b1_z.jpg


6530298083_1443f5a76a_z.jpg


6530299909_f5b6d8fb2f_z.jpg
6530302025_2cf91ccd00_z.jpg


6530296725_75921b9582_z.jpg


6530504713_4fccf118f2_z.jpg


6530491543_8a1124c0db_z.jpg


6530395851_2fb3a7a87c_z.jpg
6530489621_14a0f1d0dc_z.jpg


6530493001_63269a8bd6_z.jpg


6530510075_4e78a23ba0_z.jpg
6530500807_0833b143bf_z.jpg


6530508397_e9344e276a_z.jpg


6530541185_9e34a897ee_z.jpg
6530511599_ce8784543c_z.jpg


6530507133_5462743073_z.jpg


6530498941_9df28e20c4_z.jpg
6530503347_49d09e7575_z.jpg


6530542773_7183133ae1_z.jpg
 

Speed

Got Epic?
Regular User
Re: Barking Powerstation and Cable Tunnel Network - Sept to Dec 2011

The Cable Tunnels

Back to that very first trip again and THAT map. I had one more idea how we could access these and it only bloody worked! Talk about the Barking Catacombs! The whole site is hollow! We spent hours exploring. Take the tunnel, come up against a brick wall, work your way around, carry on exploring, reach the next bricked up door or whatever, find a way around, keep going. Pics really dont do the maze much justice.. The desired destination was the Thames cable tunnels but so far they seem elusive. We were way off our map so flying a bit blind but it seemed as if the network had been quite well sealed in that sort of direction. eventually we ended up under the live 132kv substation 'C' and were met with several anti pikey measures that prompted us to GTFO! We by no means covered the whole lot but i dont think i can keep this hush hush any longer its just too good!

6530464425_7d0bd04119_z.jpg


6530472851_c2435bfd8e_z.jpg


6530474491_7ed9eaa205_z.jpg


6530494721_c0c7e3cdef_z.jpg
6530466765_62817779bc_z.jpg


6530469335_5bd8b4d3b1_z.jpg


6530471229_3dce95e510_z.jpg


Merry Xmas!​
 
Top