1. Welcome to 28DaysLater.co.uk - 28DL - The UK Urban Exploring / Urban Exploration / Urbex Forums.

    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections plus a lot more.

    Please feel free to browse this website as a guest. Creating an account removes some ads, allows you to post replies, start new topics and threads, and gives you access to more features including bookmarking, live chat, messaging and notification systems.

    Create an account | Login | Request new password

Report - Scammonden Reservoir/Dam, Plughole Abseil - May 2010/Oct 2011.

Discussion in 'Other Sites' started by Ojay, Oct 23, 2011.

  1. Ojay

    Ojay Admin
    Staff Member Admin

    Nov 24, 2008
    Likes Received:

    Scammonden Reservoir/Dam, Plughole Abseil

    Twice visited here in the past 18 months, originally with Stepping Lightly and today with Ninjaboy..

    We originally went for a recce back in May last year, late one night SL decided he would check out the plughole ready for a return visit (which we never ended up doing amongst all the other madness).

    He grabbed a length of dynamic (yes dynamic rope) from the van and threw himself down on a piece of chain link - LEGEND!

    As I stood at the bottom, the rope bounced like fook before he emerged rather wet from the steady trickle that flowed down.

    We grabbed a few shots in the overflow tunnels and headed for the outfall, it was ankle deep rising to chest further down, needles to say we both got wet attempting to climb out.

    Another night of win :thumb

    Fast forward nearly 18 months, it's my birthday and was stuck for ideas, as I flicked through some old pics I found the previous shots which I hadn't done anything with all this time.

    A quick call to Ninjaboy, as SL is busy demo'ing shit atm overseas and we were on our way.

    We shot over the anti-climb and rigged up as quick as we could, as the addition of new trails has meant it's become a bit of a tourist trap since the previous trip.

    A few odd looks later and I was over the railings and rappelling down, my mate quickly followed behind once I was down

    Some History:

    Completed in 1971 - On Thursday 14th October of that year Her Majesty the Queen inaugurated the Lancashire - Yorkshire Motorway and said :

    "I am very glad to be here this afternoon to commemorate the completion of the Scammonden Dam and Reservoir.

    To construct a dam on this scale is a fine achievement; to build a motorway across it at the same time is remarkable.

    It is and outstanding feat of engineering and also an excellent example of effective partnership between central and local government.

    I congratulate all those who have worked so hard to bring this outstanding project to a successful conclusion".

    Water Capacity - 1730 million gallons
    Surface Area - 42 Hectares
    Dam Height - 70m / 230ft
    Bellmouth - 252 metres (827 ft) above sea level (230ft shaft)
    Recreational - Walking ,Watersports.. Oh and Abseiling

    Scammonden Dam carries the M62 motorway over Deanhead Valley in the Pennines.

    It is the first — and so far only — British reservoir embankment to carry a motorway, and combines the dual functions of water supply and highway infrastructure.

    A good way to while away a few hours, and a bloody good cure for a hangover :D

    Birthday boy











    Myself and Stepping Lightly after rappelling down to the bottom of the 230 ft shaft



    Overflow - Here myself & Ninjaboy and your's truly with SL from last year




    Outta Here

    #1 Ojay, Oct 23, 2011
    Last edited: Oct 24, 2011

    Remove this ad by donating or subscribing.

Draft saved Draft deleted

Users Who Have Read This Thread (Total: 0)

Share This Page

Remove this ad by creating an account and logging in