Construction of the 360 MW Tilbury A Power Station began in 1951, with the first unit synchronised to the national grid in 1956. Initially commissioned as a coal-fired station, the boilers were converted to burn oil before coming into full commercial operation. In 1981 Tilbury A effectively ceased operation and the station boilers and turbine hall were demolished in 1999.
Peeling paint fix for a fetishist like me.
Construction of the 360 MW Tilbury A Power Station began in 1951, with the first unit synchronised to the national grid in 1956. Initially commissioned as a coal-fired station, the boilers were converted to burn oil before coming into full commercial operation. In 1981 Tilbury A effectively ceased operation and the station boilers and turbine hall were demolished in 1999.