    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections plus a lot more.

    Please feel free to browse this website as a guest. Creating an account removes some ads, allows you to post replies, start new topics and threads, and gives you access to more features including bookmarking, live chat, messaging and notification systems.

    Create an account | Login | Request new password

Report - SSSI (Upgraded), Manchester - 2013/2014.

Discussion in 'UK Draining Forum' started by Ojay, Aug 5, 2014.

  1. Ojay

    Ojay Admin
    Staff Member Admin

    Joined:
    Nov 24, 2008
    Messages:
    4,848
    Likes Received:
    1,790

    SSSI (Upgraded), Manchester

    1.jpg


    Before we crack on with the drain, a little history of the immediate area where the work is taking place

    The area now known as Sand Hills is steeped in history and looked entirely different back in the early 1900's

    2 significant landmarks here being Moss Brook Works and Collyhurst Quarry

    33.jpg


    Moss Brook Works

    34.jpg

    The significance of this factory, was that in 1909 Elijah Ashworth developed and submitted a patent to improve carding engines

    35.jpg 36.jpg 37.jpg

    Collyhurst Quarry


    Beyond the compound where the sewer upgrade is now taking place, exists an outcrop of red rock and is all that remains of Collyhurst Old Quarry today

    50.jpg


    History lesson over, back to Drains...

    During late 2012, I noticed some plans go on-line for unsatisfactory intermittent discharges to be addressed here

    One of 200 improvements being made by United Utilities at a cost of £600m

    31b.jpg


    Of course it was a waiting game, with a number of trips during different phases of construction

    I lost a few pics along the way and I ended up moving away from Manchester which made follow up visits less frequent

    However I still found time here and there when home to look in on the progression...

    3.jpg


    The cobbled streets of Fitzgeorge St once looked a lot different than above

    Below a pic from the archives dated 1960 where rows of terraced houses once stood

    Fitzgeorge2.jpg


    And this is how it looked in 2013 soon after work commenced

    4.jpg


    Here, a shot taken by Nick as they drove in the sheet piling, in preparation for construction of the new filter system

    5.jpg


    The upgrade work taking place will address the spill problems from the original Victorian setup which was constructed circa 1938

    Here, the overflow chamber (MAN0050 CSO) is located nearly 20m below Rochdale Road as seen on this older st. view pic, c/o Google

    2.jpg


    And here it is below ground

    6.jpg


    Work 5 Interceptor Sewer

    7.jpg


    Work 6 Interceptor joins, ahead of a tumbling bay

    8.jpg


    Constructed circa 1938, here is a pic of the old boys stood within the tumbling bay in 1939 (Work 6 sewer) which connects u/s of the overflow chamber

    9.jpg
    (pic c/o Manchester Libraries)


    The now defunct Penstock control chamber sits high above the sewer, the kiosk that serves it removed the day before I took these shots..

    10.jpg

    11.jpg


    t'other side

    12.jpg

    13.jpg


    At capacity it acts as a storm overflow, dumping it's sewer fresh load into the River Irk

    14.jpg
     

    Remove this ad by donating or subscribing.

  2. Ojay

    Ojay Admin
    Staff Member Admin

    Joined:
    Nov 24, 2008
    Messages:
    4,848
    Likes Received:
    1,790

    The original set-up was a a 5ft 8" brick overflow pipe down to the Moss Brook/Irk

    1b.jpg


    The recent overhaul had seen the original brick overflow intersected

    Whilst the dig was under way for the below ground structures, 3 x 1.68m HDPE pipes were used whilst the re-connection chambers were constructed

    51b.jpg


    ..and below ground having been inserted into the original overflow

    52.jpg


    Once completed, storm flows will be diverted from the existing brick overflow to the new screening facility,
    and returned back to the existing overflow via additional diversion and re-connection chambers

    15.jpg


    Primary overflow/re-connection chamber

    16.jpg

    17.jpg


    The original brick overflow has now been intersected and any discharge is now diverted via the 7ft box section on the right towards the screening facility

    We took these pics, whilst the chamber was undergoing different stages of construction

    Here you can see the construction of a relief weir

    Under storm conditions this will allow excess discharge to spill into the existing brick overflow, reducing pass forward flow to the screening facility

    Realistically this would require a prolonged amount of rainfall as the re-connection chamber also acts as an in-line detention tank

    It would mean unscreened waste water could still pass into the Irk, however it's deemed acceptable by the Environment Agency due to the limited annual events this would occur

    18.jpg

    20.jpg

    40.jpg


    On a follow up visit, the weir was almost completed, with only the top section shuttered and concrete having been tipped the same day

    42.jpg

    41.jpg


    Primary overflow - Under Construction

    58.jpg

    45.jpg


    Spill flows are now diverted via the 7ft concrete box on the right

    44.jpg 19.jpg


    Around 20ft of 'box', any resulting discharge passes through this inlet channel down to the screening chamber

    39.jpg


    Beyond, a set of upstream penstocks to enable the screen to be isolated

    21.jpg


    Naturally I monkey'd my way over to see what lay beyond..

    (See Screening Chamber further below)

    23.jpg 22.jpg


    Some pics of the penstock setup from below and beyond, once the system was completed

    61.jpg

    62.jpg

    It should actually read Rochdale Road or Fitzgeorge Street, then again the discharge runs into the sewer that joins Collyhurst Road anyhow

    But who really cares other than me ;)

    64.jpg
     
  3. Ojay

    Ojay Admin
    Staff Member Admin

    Joined:
    Nov 24, 2008
    Messages:
    4,848
    Likes Received:
    1,790

    Screening Chamber


    Today, the screens had only just been lowered into position..

    43.jpg


    A few weeks later..

    46.jpg


    Screening facility, under construction..

    24.jpg

    25.jpg


    Almost completed..

    47.jpg


    Rags & sewage are removed from the escalators, the screen launder troughs convey the screenings back to the nearby combined sewer

    (as seen here, but still under construction and not yet connected)

    32.jpg

    38.jpg


    Here, the connection to the sewer and the elevated screens once the system was completed

    55.jpg

    59.jpg


    2 x 2.4m wide channels convey filtered spill flows downstream to the outlet

    26.jpg 28.jpg


    A handy ladder, enabled us to get below and beyond the escalators ;)

    Here, a small holding tank is equipped with duty/standby launder pumps located within a small sump (to the left, and just out of shot)

    This allows waste water to be retained and pumped back to the nearby sewer

    27.jpg


    From above, the newly installed pumping system, whilst it was being installed

    48.jpg


    On a later visit, the pumps were sat on the sidelines awaiting installation

    49.jpg


    And here on a final visit, the launder system operational

    56.jpg

    63.jpg


    Here, the outlet into the downstream re-connection chamber, which joins back with the existing brick overflow to the Irk

    29.jpg


    As of August 2014, the work is completed, only 3 months behind schedule..

    "Are you short staffed ?" :rolleyes:

    53a.jpg


    Funnily enough (not) the viaduct and surrounding area was bombed during a blitz on 2nd June 1941 here, amazingly the City Engineers managed to piece it all back together again


    65.jpg
    (Then/now pic cobbled together by Nickindroy)


    Things looked good for over 73 years, until United Utilities quality makeover of the pedestrian area leading up Fitzgeorge Street as seen here

    54.jpg


    On closer inspection it appears they ran out of tarmac and managed to salvage some spare concrete from the skip, that and a piece of 3x2 scant to shutter a continuation from the footpath boundary

    Instead of the usual tamping, looks like the side of an old shovel was used for that rustic look, thing is it looked better after the Luftwaffe had bombed it :D

    The Victorians would be turning in their graves, still what else do you expect for £3m nicker :rolleyes:

    Hopefully someone will manage to do a better job with the landscaping in the next few weeks :popcorn


    Despite the slightly late completion and some questionable attention to detail here and there, the system seemed to work fine after it's first major spill

    60.jpg


    Sorted.. The tranquil waters and tropical paradise that is Moss Brook, complete with an Ojay

    30.jpg

    All that is left now is the above ground landscaping, the surface area surrounding the machine access was shuttered yesterday awaiting concrete & tamping

    As I'm away again it may be a few weeks before I can grab a finished pic above ground..

    Thanks also to Nick for the efforts dodging CCTV and workers etc on this one and a few aborted missions...

    Not forgetting credits for pics used here too and for assisting with research into some of the Collyhurst stuff included :)

     
  4. Nickindroy

    Nickindroy A Porky Prime Cut
    Regular User

    Joined:
    Feb 20, 2012
    Messages:
    767
    Likes Received:
    304
    Brilliant. Loved keeping an eye on this, seeing it move along so fast. ;) A great read also mate. The shoddy finishing is a disgrace, I'm sure they were, indeed, short staffed. :thumb
     
  5. Snake Oil

    Snake Oil go in drains
    Regular User

    Joined:
    Dec 8, 2011
    Messages:
    846
    Likes Received:
    376
    Home Page:
    quality stuff, its name will have to change to 'not-so-SSSI' now :D ...and an added bonus of pikey proof plastic so with a bit of luck the ladders will last a bit longer in this :D
     
  6. Lenston

    Lenston Bajo Tierra
    Regular User

    Joined:
    Mar 9, 2013
    Messages:
    1,319
    Likes Received:
    988
    Epic stuff mate, nice report
     
  7. ViralEye

    ViralEye Drain Ninja
    Regular User

    Joined:
    Sep 24, 2012
    Messages:
    190
    Likes Received:
    8
    a s**t hot report as usual! Loving the old pictures to see how it used to look.

    In 100 years time it'll be your face on all the "old" pictures of drains :thumb
     
  8. ACID- REFLUX

    ACID- REFLUX 28DL Regular User
    Regular User

    Joined:
    Oct 19, 2013
    Messages:
    2,746
    Likes Received:
    1,446
    Great report :thumb

    I"m learning more about the UK"s Sewer System every week.....cheers :)
     
  9. Kaplan

    Kaplan Procrastinator
    Regular User

    Joined:
    Apr 9, 2011
    Messages:
    402
    Likes Received:
    104
    Home Page:
  10. Camera Shy

    Camera Shy Old enough to know better
    Regular User

    Joined:
    Nov 14, 2011
    Messages:
    1,117
    Likes Received:
    859
    You've put a lot of effort into that,the modern parts are very dull but got to admire your dedication (if that's the right word)
     
  11. The Lone Ranger

    The Lone Ranger Safety is paramount!
    Staff Member Moderator

    Joined:
    Feb 25, 2010
    Messages:
    1,183
    Likes Received:
    868
    Home Page:
    Looks a lovely stroll, and a very enjoyable report too :thumb
     
  12. Ojay

    Ojay Admin
    Staff Member Admin

    Joined:
    Nov 24, 2008
    Messages:
    4,848
    Likes Received:
    1,790
    You have to sneak in when the workers are having a safety brew, looks like they had a fair few since they went 2 months over and the landscaping still needs to be completed, personally I'd have spent the money restoring Collyhurst all them years back as quite an important industrial area of Manc is now a bigger turd above ground than below!
     
  13. Bunk3r

    Bunk3r 28DL Memb3r
    Regular User

    Joined:
    Jun 6, 2007
    Messages:
    316
    Likes Received:
    118
    wasn't expecting another uber drain report so soon, nice one.
     
  14. Nickindroy

    Nickindroy A Porky Prime Cut
    Regular User

    Joined:
    Feb 20, 2012
    Messages:
    767
    Likes Received:
    304
    There was a piano there at one point, after the annual derp lurkers ball, but Ojay weighed it in. :D


    JqWSGAa.jpg
     
  15. Camera Shy

    Camera Shy Old enough to know better
    Regular User

    Joined:
    Nov 14, 2011
    Messages:
    1,117
    Likes Received:
    859
    WTF ? ^^instant improvement^^ derp lurkers ball ? Sounds like a nasty injury you'd get from climbing over some pallisade fence.
     