Explored with @The Stig
History
This culvert was constructed, using concrete, between 1907-1911. This was to guide the Ouseburn underneath the suburb of Heaton. It runs for a total length of 2150 ft, at a cost of £23,000. The southern portal opens beneath the Ouseburn Viaduct, some of which...