opened in1892 for the Mansfield ,Sheffield and Lincolnshire railway it is 474 yds long ,the trough route closed in 1963 but the tunnel was used up till 1964 to serve Hydes sidings in 1985 the northern portal was lost to the inner relief road ,there is a shaft with ladders at the northern end,the...