real time web analytics
Report - - Chipping Norton Railway Tunnel May 2022 | Underground Sites | 28DaysLater.co.uk

Report - Chipping Norton Railway Tunnel May 2022

Hide this ad by donating or subscribing !

mookster

grumpy sod
Regular User
Believe it or not I have only ever photographed two railway tunnels, with this being the second one. The first was seven years ago and my photos of it were awful. This one however was too local to me to not do at some point, and it was a lovely and cool, if a little damp, place to be on a hot May afternoon.

The Banbury & Cheltenham Direct Railway was an amalgamation of three schemes built between 1855-87. The first involved a 4½-mile branch to Chipping Norton, built by the Oxford Worcester & Wolverhampton Railway from its main line at Kingham. Then came the Bourton-on-the-Water Railway - a 6½-mile branch heading westwards from Kingham and opening in 1862. Authority was granted in 1873 for extensions to both these lines, creating a through route between Banbury and Cheltenham. The first missing link, between Cheltenham and Bourton, was filled eight years later whilst the second resulted in a railway heading eastwards from Chipping Norton to meet the Birmingham-Oxford line at King's Sutton. The first train over it - operated by the Great Western - ran on 6th April 1887. The whole route had been absorbed into the GW by 1897.

The line's construction was blighted by financial constraints and over-optimism. Opposition was encountered from local landowners who resolved to prevaricate as long as possible, before demanding vast amounts of money and concessions from the company. All this resulted in sporadic bursts of construction activity, separated by lengthy dormant periods.

Work on the final section of route - incorporating Chipping Norton Tunnel (BNK/50) - got underway in 1875. Another Act of Parliament, passed in 1877, was needed following difficulties with the alignment and associated land purchases. W J Lawrence, the contractor, was suffering financial problems, resulting in the B&CDR ending its arrangements with him late in 1876. But the railway company was also struggling to make ends meet, resulting in precious little work taking place throughout 1876 and 1877. By this time, some progress had been made with the tunnel, including the sinking of at least one shaft.

August 1877 brought the death of Edward Wilson, the engineer; three months later, another contractor, A Terry, had his contract terminated. Appointed as his replacement was Henry Lovatt but before he could start, the company suspended work on the route's eastern section. Lovatt continued to carry out maintenance of the tunnel workings, having received a small sum for this purpose.

A further Act of Parliament was obtained in 1879, enabling the company to raise additional funds. When activity resumed, it was focused between Cheltenham and Bourton as this was deemed to be more commercially viable. As a consequence, progress with the tunnel - which had been suspended since September 1876 - was not made for another seven years. A Receiver was appointed to run the B&CDR's affairs in 1881.

Initially planned to be 484 yards long, an extension to the tunnel had been authorised as part of the July 1877 Act, increasing its length by around 150 yards. An inspection of the workings took place in January 1883, with a view to work restarting under another contractor, C E Daniel. By May, miners were busy underground, with an additional shaft having been sunk near the south end and a heading being driven towards the centre shaft where a section of tunnel had been completed prior to activity being halted seven years earlier. A third shaft was active near the north end.

On 1st August 1883, the company agreed a variation with the contractor, increasing the tunnel's length once again, this time to 715 yards. On the last day of that month, a navvy's hip bone was broken after a large piece of timber sprung out and hit him as he assisted with the removal of centring from a length of completed arch. The heading was through soon after and most of the construction work had finished by the following May, only for works to be suspended again before the south portal had been erected.

The company's continuing monetary constraints affected progress along the rest of the line. It was not until September 1886 that Major General Hutchinson inspected the route for the Board of Trade and a further six months had elapsed before the first revenue-earning train ventured through the tunnel. It remained operational for just 75 years, with closure claiming it on 3rd December 1962.

That history was shamelessly lifted from the old forgottenrelics website.

Getting to it was simple enough after finding a spot to park as close to it as possible. After about a ten minute walk and a muddy scramble down the side of the portal we were in. Due to the amount of heavy sporadic rain we've had in the area over the last week or so, there was a lot of water coming into the tunnel from the roof, which made parts of it feel more like being in a waterfall than a tunnel and I ended up emerging from the portal afterwards considerably wetter than I was expecting (hurr durr).

The calcite deposits in here are the main draw, they are probably among the most impressive in any tunnel in the country.

52091334451_1ac3cab939_b.jpg


52091334426_439bdd8150_b.jpg


52091334381_4e2fd4829b_b.jpg


52091838260_ab2c0a239d_b.jpg


52090306287_88071bdf1b_b.jpg


52091580449_01b26af2e6_b.jpg


52090306232_3422b69e12_b.jpg


52091334281_29f860b512_b.jpg


52091580379_a9381137e5_b.jpg


52091334236_28254c2bb7_b.jpg


52090306127_00c2cd00de_b.jpg


52091838300_8d7009f642_b.jpg


52091838285_2cea293060_b.jpg


52090306042_4c14975e4e_b.jpg


Thanks for looking :)
 

gingerspeedfreak

28DL Full Member
28DL Full Member
Great report and I love the pics. The forgotten relics website is a gold mine of info on the old rail infrastructure. :thumb
 

Who has read this thread (Total: 150) View details

Top