Afternoon Guys,

This was one of the most fun places I've ever explored, it's not very easy to get to and requires lots of walking up an down the mountain, but well worth it!

Introduction

Another place I visited with my friend on our non-exploring holiday, was Dinorwic Slate Quarry, the second largest slate quarry in the world. The quarry covered over 2.8 sqkm, consisting of two main sections and 20 galleries.

The manufacturing process of roof slate is incredibly wasteful, with only 10% of slate removed from the quarry face ending up as salable slate. This is reflected in the architecture of the buildings, inclined railways and pathways; all of which are constructed from huge blocks of un-usable slate. You can’t imagine how much slate there is, and how much it’s used until you see it, my poor attempt at photographing this epic site does little to convey its enormity.

All the finished roof slate was made on the mountain side, so the quarry had a network of railways to transport blocks of ‘raw’ slate to be cut up into workable chunks for skilled workers to shape into the various styles and sizes of roof slate required.

Due to the fragility of slate, the workers had to make 128 slates to be paid for only 100, the 28% margin was allowed for breakage outside of the quarry down to the docks where the slate was shipped across the globe.

The quarry consisted of a number of faces, which various levels. Each face of each level was blasted daily and the slate ‘boulders’ were removed by hand and transported by railways on each level and cut up into smaller pieces ready to be shaped. Once the slate was finished it was transported to the end of the levels to the inclines, where it was loaded into trucks and sent down the incline via gravity. The force of the loaded slate moving down the incline would lift the empty trucks up ready for loading.
The problem was that there were just too many inclines, and it would take hours for a piece of slate to get from the top of the quarry to the bottom


History

Slate quarrying has taken place on the site since 1787 with the first horse drawn tramway constructed in 1809. Dinorwic employed over 3,000 men at its height, falling to 600 by 1969 when it finally closed. For 70 years the main motive power was horse and hand until steam locomotives were introduced in 1870 to work the various levels. These engines were vertical boilered locos supplied by De Wintons, a few years later Hunslet supplied larger locos, two of which are still working in preservation today.

Between 1935 and 1949, 22 internal combustions locos were bought for use on the levels. However they didn’t last as long as their steam cousins, since the quarry closed in 1969.
The quarry closed due to many factors including: Imports, changes in building materials, and the shear size of the place and the numerous waste tips which were beginning to slide.





View from near the top, looking towards Snowdonia
2cc6f677.jpg





What it was all for, slate:
fd69b120.jpg





The winding gin at the top of the incline:
541f59a0.jpg





5c1b7e2f.jpg





Everything is made from slate, including the inclined railway embankments:
1649982d.jpg





One of the inclines and tugs used to move loaded slate wagons down the mountain:
9b4e8035.jpg





c57ea359.jpg





Evidence of the railways on the levels, used to transport unfinished slate:
88f4768f.jpg





Tunnels, connecting the different quarry faces to the levels:
dad1f105.jpg





97f807f5.jpg






0c811685.jpg





99d75d02.jpg





The massive cutting shed:
eb586c69.jpg





73f92d38.jpg





Slate cutters workshops:
bf20255e.jpg





Various compressor engines equipment:
20a10145.jpg





d79ee0c0.jpg





e8bf8a13.jpg





05ac6c1f.jpg





The worker’s cottages, each only two rooms:
8ead3f12.jpg

Regards
 

georgie

He Never Even Got There
28DL Full Member
did you have a look at dinorwic quarry hospital whilst you was there m8 its worth a little look

DSCF4370.jpg


DSCF4373.jpg


DSCF4365.jpg


DSCF4362.jpg


DSCF4360.jpg


its not UE but nice to see specially with the morg right next door aswell

DSCF4406.jpg
 