Report - Helmsley ROC Post - (Yorkshire Group) - December 2011

  • Welcome to - 28DL - The UK Urban Exploring / Urban Exploration / Urbex Forums.

    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections plus a lot more.

    Please feel free to browse this website as a guest. Creating an account removes some ads, allows you to post replies, start new topics and threads, and gives you access to more features including bookmarking, live chat, messaging and notification systems.

    Create an account | Login | Request new password


28DL Full Member
28DL Full Member
Jul 2, 2009
1968 Closure. Visited with Triplesix.

Status: Open.

This post had previously been capped with concrete, and for a reason. This is now not the case and there is a very small hole in the top just small enough for someone to squeeze through. There has been a long extension to the sump pipe fitted - so that water can be drained far away from the post. This is now inside the hatch and protruding from the hole. The surfacr features were still intact somewhere in the overgrowth. Internally - the post is flooded to about 8" with black minging water. Not a nice post. Possibly one of the worst i've visited. The ladders felt really unsafe too.

Access Shaft

Monitoring Room

Entrance Area

Oh Hai There

Krypton :)


Similar threads