Web
Analytics
Report - - Narrow Gauge Railway Repair Workshops - Poland - October 2017 | European and International Sites | 28DaysLater.co.uk

Report - Narrow Gauge Railway Repair Workshops - Poland - October 2017


opuszczone.net

28DL Full Member
28DL Full Member
The construction of the workshops began in 1898. In 1912, the complex was expanded and modernized. At its peak, the workshops were the most modern and largest in Europe. In the 1960s, they employed 450 people. In 1974, the last repair of the locomotive was carried out in the workshops. From 1989, the rolling stock consisted only of diesel locomotives, which were repaired by 104 employees. In 2001, it was decided to shut down all narrow-gauge railways in the area, which resulted in the liquidation of workshops.
DSC07200.jpg


DSC07092.jpg


DSC07087.jpg


DSC07143.jpg


DSC07181.jpg


DSC07184.jpg


DSC07200.jpg


DSC07243.jpg


DSC07307.jpg


DSC07272.jpg



DSC07322.jpg


DSC07342.jpg


Full set: LINK
 

wormster

28DL Full Member
28DL Full Member
Stunning - shame it got shutdown
 
Thread starter Similar threads Forum Replies Date
opuszczone.net European and International Sites 3

Similar threads


Top