Report - Redmire Works - Sheffield - Jan 2011

  • Welcome to - 28DL - The UK Urban Exploring / Urban Exploration / Urbex Forums.

    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections plus a lot more.

    Please feel free to browse this website as a guest. Creating an account removes some ads, allows you to post replies, start new topics and threads, and gives you access to more features including bookmarking, live chat, messaging and notification systems.

    Create an account | Login | Request new password


темний Прип'ять
28DL Full Member
Hi Guys,

A few reports of this place have gone up, so i thought id post my pictures back from my visit at the end of January.

A small place, but i thought plenty to see inside.

Copied history of which i got from the other threads incase you haven't seen it before:

Redmire Reservoirs are located in Fulwood, Sheffield in South Yorkshire. They are fed from various small streams including Fairthorn Clough from the Hallam Moors. Consisting of three reservoirs known as Upper, Middle and Lower, these were built to supply clean drinking water to Sheffield following a Cholera epidemic in 1832.

The Water Treatment Works are located beside the Lower reservoir The old treatment plant. dating back to 1950, supplied water to the south-western outer areas of Sheffield utilising the Ringlow and Rudd Hill service reservoirs It used seven horizontal pressure filters which were installed in 1950 and clear water tank which was installed 1983.

Preliminary treatment of the water began in the lower reservoir before it was filtered. Lime was added to separate the natural aluminium from the water, making it clump together so it could be filtered out.

The Treatment Works produced water below modern standards, although it was still safe to drink. The water was of a satisfactory colour and cleanliness, but iron and aluminium levels were too high. A new plant was constructed opposite the old works in 1986-8 and made use of the Australian system called the Sirofloc Process. The water from this new plant was then piped to the old works to be filtered as a final process.

















Thanks for looking.


Last edited:

Similar threads