Report - - Thelwall Viaduct North Bound, Warrington, Jan 2011 | Other Sites | 28DaysLater.co.uk
  • Welcome to 28DaysLater.co.uk - 28DL - The UK Urban Exploring / Urban Exploration / Urbex Forums.

    Asylums and Hospitals, High Stuff, Industrial, Leisure Sites, Residential Sites, Military Sites, Mines and Quarries, ROC Posts, Theatres and Cinemas, Draining, Underground Sites, European and International Sites, Leads, Rumours and News, Kit, Clothing, Equipment, Photography and Video sections, plus Private & Local Groups and a lot more.

    Please feel free to browse this website as a guest. However, creating an account allows you to search, post replies, start new threads, use bookmarking, live chat, messaging and notification systems. Also, it removes some ads.

    Create an account | Login | Request new password

Report - Thelwall Viaduct North Bound, Warrington, Jan 2011



Scorpion

28DL Full Member
28DL Full Member
#1
Thelwall Viaduct South Bound, Warrington, Jan 2011

Ive reported on these before but with shots from my phone which werent very good so i did the south bound again with a digital a fiew months ago but ive only just got round to posting them on here ill have to get back there and do the north one aswell some time

heres a bit of info streight from wiki

The Thelwall Viaduct (grid reference SJ664883) is a steel composite girder viaduct in Thelwall, Warrington, England. It carries the M6 motorway across the Manchester Ship Canal and the River Mersey. Its location on the motorway network is between junctions 20 and 21 of the M6, the former being also known as junction 9 of the M56.

It actually comprises two entirely separate bridges, one carrying the northbound carriageway (opened in July 1963) and one the southbound carriageway (opened in 1995). Both viaducts are approximately 1.35 km long, with the longest span being 102.4 m over the Ship Canal.

In July 2002 a failed roller bearing was discovered and it became necessary to close all but one northbound lane. As the M6 at the time carried an estimated 150,000-160,000 vehicles per day, this led to serious congestion. The viaduct was not completely reopened to daytime traffic until February 2005, and subsequently remained partially closed at night for further remedial work to take place. In all, 148 bearings were replaced, with the repair scheme costing £52 million.

Given the bridges height and openess to the elements it has frequently been the subject of speed reductions due to strong gusts of wind that badly effect the stability of high sided vehicles. On several occasions lane closures have resulted as a consequence of articulated vehicles simply being blow over. However, the open sides of the bridge are a deliberate design feature to reduce the likelihood of snow drifts building on the carraigeways.

Enjoy

IMG_0340.gif


IMG_0336.gif


IMG_0333.gif


IMG_0321.gif


IMG_0315.gif


IMG_0311.gif


IMG_0289.gif


IMG_0283.gif


IMG_0282.gif


IMG_0277.gif


IMG_0274.gif


IMG_0269.gif


IMG_0268.gif


IMG_0316.gif


IMG_0307.gif


IMG_0331.gif


IMG_0299.gif


IMG_0351.gif


IMG_0327.gif
 
Last edited:

Similar threads