Decided to see whats happening at this site since I was in the area, the top is still concrete capped, however the rear of the reservoir has been exposed, and it is currently being converted into a garage for cars/buses. Still no way in, but it looks like the builders are going to knock through the back to make a doorway for the vehicles to be stored inside.
The front, which was previously hidden behind thick overgrowth, is now exposed to the main road and the doorway blocked up
The top remains much the same as previous reports, access hatches completely blocked with concrete
Round the back is where things have changed. The earth around it has been dug down to expose the wall of the reservoir, and in this section is where a door and vehicle ramp will be fitted to allow access. Hopefully once the builders knock through it will give us a short period of time to get inside again, although it obviously won't be the same with one side missing
The front, which was previously hidden behind thick overgrowth, is now exposed to the main road and the doorway blocked up

The top remains much the same as previous reports, access hatches completely blocked with concrete

Round the back is where things have changed. The earth around it has been dug down to expose the wall of the reservoir, and in this section is where a door and vehicle ramp will be fitted to allow access. Hopefully once the builders knock through it will give us a short period of time to get inside again, although it obviously won't be the same with one side missing
