Today it has pissed it down which meant a big no to drains :(

Driven under Cocker Hill, Stalybridge New Tunnel welcomed eastbound services onto the Micklehurst loop which effectively four-tracked the LNWR's main trans-Pennine route via Diggle, albeit involving alignments on opposite sides of the Tame Valley.

Whilst the tunnel was being constructed, services had to be cancelled in St George's Church, sitting almost above it - explosions shook the foundations, causing cracks to appear. Thanks to the sinking of a construction shaft, headings were driven from one intermediate point as well as both ends. This was later infilled, not retained for ventilation.

The tunnel is 315 yards long, straight and lined throughout in blue brick.

In August 1913, a Leeds-Llandudno express ploughed into the rear of a goods train which was making slow progress through the tunnel. The guard's van and several wagons were wrecked but the guard escaped death by jumping from his van onto the adjacent line. A breakdown gang was summoned to clear the debris.

Although the through line was severed in 1966, a spur through the tunnel remained open until 1976, serving a local power station.

I was driving right past so decided to have a look at the Stalybride new tunnel


14888037491_95c0c273af_c.jpg


14704421830_fa6038f1e7_c.jpg


14890749602_3e22e7f6bb_c.jpg


14704497928_8161a7900b_c.jpg


14868097056_e73178bb0c_c.jpg


14888027391_1ee7b49bf4_c.jpg
 

The Lone Ranger

Safety is paramount!
Staff member
Moderator
It's a nice wee stroll, great pics :thumb

I bet the slope up/down to the entrance was fun in the rain, I went on my arse a couple of times in similar conditions.
 