This underground generation station comprised of:
Three GEC/Fullagar six cylinder vertically opposed two stroke diesel 1 megawatt gen sets
and a Ruston Hornsby gas turbine.
The roof, which looks remarkably new, is decades old.
The first few images may be to do with ventilation, I am unsure, this was a bit of a rushed point but was in the area of the generating station.
1.
2.
3.
4. An old helmet and one of the vents to the outside
5.
Into the Generating Station...
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
D-UK
Three GEC/Fullagar six cylinder vertically opposed two stroke diesel 1 megawatt gen sets
and a Ruston Hornsby gas turbine.
The roof, which looks remarkably new, is decades old.
The first few images may be to do with ventilation, I am unsure, this was a bit of a rushed point but was in the area of the generating station.
1.
2.
3.
4. An old helmet and one of the vents to the outside
5.
Into the Generating Station...
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
D-UK