There's been a lot of speculation about what's been demolished or removed as it's a bit awkward getting in here recently, so I hope this gives some sort of idea of what's happened on the site recently.
In short: It's still possible to get in weekdays - we saw no security thursday morning. Less than 1/6 of the site is being worked on and the majority of it is how it was 12 months ago, albeit some windows on top floors have gone and in some areas downstairs floors missing.
The Acute block has indeed gone. The roof of the main building is fine and nothing has been removed in this respect.
The smaller ancillary buildings in the courtyards/exercise courts are being gradually demolished.
Most activity is behind the Admin block, around the Laundry and the base of the Water Tower. The tunnel network is totally intact but opens to daylight at the base of the Water Tower, making you very visible to the builders! Also there is an excavator currently working above the tunnel under the water tower and it's a bit bloody scarey when it starts up inches above your head. The water tower is as it was 12 months ago, so anyone wanting to get up it, go soon coz it's being demolished in August by explosives!
Some of these shots are panoramics and a bit wide/not to the 800 rule, so apologies for wide pics, but hope you'll want to see them regardless.
1.
Main focus of redevelopment behind the Admin block and water tower/laundry
2.
3.
Looking from 3rd floor of nurses accomodation to the hall
4.
This hacks me right off the way the builders have just thrown shit out the windows, frequently without removing the f***ers first.
5.
6.
Newbuild area between Acute block and main building. Urgh
7.
The big pile of bricks here used to be the Acute block
8.
Close shave....
**********************************************************************************************************
We're going to try and get back over there every few months until its finished, so hopefully more info and piccies soon. Hope this all looks okay, if anyone wants to join us sometime, please PM me.
ghost
In short: It's still possible to get in weekdays - we saw no security thursday morning. Less than 1/6 of the site is being worked on and the majority of it is how it was 12 months ago, albeit some windows on top floors have gone and in some areas downstairs floors missing.
The Acute block has indeed gone. The roof of the main building is fine and nothing has been removed in this respect.
The smaller ancillary buildings in the courtyards/exercise courts are being gradually demolished.
Most activity is behind the Admin block, around the Laundry and the base of the Water Tower. The tunnel network is totally intact but opens to daylight at the base of the Water Tower, making you very visible to the builders! Also there is an excavator currently working above the tunnel under the water tower and it's a bit bloody scarey when it starts up inches above your head. The water tower is as it was 12 months ago, so anyone wanting to get up it, go soon coz it's being demolished in August by explosives!
Some of these shots are panoramics and a bit wide/not to the 800 rule, so apologies for wide pics, but hope you'll want to see them regardless.
1.
Main focus of redevelopment behind the Admin block and water tower/laundry
2.
3.
Looking from 3rd floor of nurses accomodation to the hall
4.
This hacks me right off the way the builders have just thrown shit out the windows, frequently without removing the f***ers first.
5.
6.
Newbuild area between Acute block and main building. Urgh
7.
The big pile of bricks here used to be the Acute block
8.
Close shave....
**********************************************************************************************************
We're going to try and get back over there every few months until its finished, so hopefully more info and piccies soon. Hope this all looks okay, if anyone wants to join us sometime, please PM me.
ghost
