Ouvrage Denting is a lesser work (petit ouvrage) of the Maginot Line. Denting was approved for construction in May 1931. It was completed at a cost of 11 million francs
Denting comprises three infantry blocks.[4] The blocks are linked by deep underground galleries, which also provide space for barracks, utilitiesand ammunition storage. The galleries are excavated at an average depth of up to 30 metres (98 ft).