real time web analytics
Report - - Pyestock Anechoic Chamber, March 19 | Industrial Sites | 28DaysLater.co.uk

Report - Pyestock Anechoic Chamber, March 19

Hide this ad by donating or subscribing !

UrbanDoll

28DL Full Member
28DL Full Member
History

The National Gas Turbine Establishment, part of the royal aircraft establishment was the prime site in the UK for design and development of gas turbine and jet engines. It was created by merging the design teams of Frank Whittle's Power Jets and the RAE turbine development team run by Hayne Constant.
For over 50 years Pyestock was at the forefront of gas turbine development. It was probably the largest site of its kind in the world. V bomber, Harrier and Tornado engines were tested on site. The power of the air house allowed Concorde's engines to be tested at 2,000 mph. Every gas turbine installed in Royal Navy ships was checked here; captured Soviet engines were discreetly examined.
NGTE Pyestock closed down in 2000 and was decommissioned to make way for a business park.

(taken from wikipedia)



IMG_9399.jpg


IMG_9401.jpg


IMG_9404.jpg


IMG_9405.jpg


IMG_9406.jpg


IMG_9407.jpg


53916305_2144218689186466_6955513061276909568_n.jpg
 
Last edited:
Top