Some Backround

The Redcar Steelworks were a fully integrated steelwork and, apart from the blast furnace, comprised a sinter plant, coke works and a power station among others. Both the blast furnace and the coke ovens produced gases as a by-product, which were supplied to the power station via two pipelines in order to produce electricity, which was used to run the steelworks.The power station itself consists of a boiler house and a turbine hall, which also contains several compressors. The compressors provided high-pressure air for the steelmaking process, which was injected into the blast furnace.

For a brief history of the Redcar Steelworks look here.

The Explore

I visited the Redcar Power Station with @Terminal Decline early December last year.

Hope you enjoy the pics.


IMG_2580.jpg

Photo taken in the early morning on our way back.

IMG_2579.jpg

Photo taken in the early morning on our way back.

IMG_2468.jpg

This diesel generator was located in a small room just next to the main entrance gate and seemed to be in working order. (Probably generating the electricty for keeping the lights on)

IMG_2499.jpg

The compressors are located between the turbines.

IMG_2505.jpg


IMG_2518.jpg


IMG_2529.jpg


IMG_2535.jpg


IMG_2539.jpg


IMG_2551.jpg


IMG_2555.jpg

One of the compressors.
IMG_2514.jpg


IMG_2542.jpg


IMG_2517.jpg

The boiler house

IMG_2572.jpg


Thanks for looking.
 

stranton

subterranean explorer
Regular User
nice photographs,
it's never changed since our 2016 visit shame about the rest of the site tho.
 