For now I'll just report the power plant, Seriously worth it's own report for sure. We managed a fair amount of the site with the light so if you'd like to see some more of the rest of the site register your interest and I'll do a round 3.
So why have 5 seperate turbines of different ages and even different makes? I don't
understand. Presumably they're different sizes, maybe they needed to expand and did it turbine at a time? All I know is that it gives great variety and definitely a turbine hall not to be forgotten. I couldn't tear myself away, haven't much experience in turbines or knowledge but everytime I wander up the steps to a hall my jaw drops every time without fail.
Not knowing what to expect this surprised me, I expected a pair of uniform neat turbines, not a mish mash of 4 in various colour. It's an amazing site on its own and stands out even amongst the endless tangle of pipes it once gave life to just outside.
Sitting up on the gas tower the other night with Maniac I spotted the 2 uniform chimneys in the distance and got thinking, few hours of research later I was 70% sure it was the 732MW Power plant mentioned in various articles. Promising MR a visit, I told him to prepare for Turbonz. I promised and I gave. Enjoy round 2
History
The site which is in Coryton Essex United Kingdom is run by Coryton Energy Ltd. It opened in 2002 and was built by Bechtel, is owned by Intergen, based in Burlington, Essex. MA USA, and cost £470 million.
It is a CCGT type power station that uses natural gas. It has two ABB Alstom GT26 gas turbines from which the exhaust gas leads to two heat recovery steam generators. These power one steam turbine. The station connects to the National Grid at the nearby 400 kV Coryton South substation.
The boiler design is a villager type. Optimised running in marginal markets is not possible due to these weaknesses.
Pictures
Tanlge of gas running passed the plant
Turbine hall
Turbine 1 is now gone but this is what remains (I think?)
Turbine 2
Turbine 3
Turbine 4 (Monster)
Turbine 5
Dunno what one is my fav... :S
Boiler Control room, again stripped but more interesting than the last one
Connecting Pipes etc.
The Caruthers 20t Gantry Crane
Various
For now I'll just report the power plant, Seriously worth it's own report for sure. We managed a fair amount of the site with the light so if you'd like to see some more of the rest of the site register your interest and I'll do a round 3.
So why have 5 seperate turbines of different ages and even different makes? I don't
understand. Presumably they're different sizes, maybe they needed to expand and did it turbine at a time? All I know is that it gives great variety and definitely a turbine hall not to be forgotten. I couldn't tear myself away, haven't much experience in turbines or knowledge but everytime I wander up the steps to a hall my jaw drops every time without fail.
Not knowing what to expect this surprised me, I expected a pair of uniform neat turbines, not a mish mash of 4 in various colour. It's an amazing site on its own and stands out even amongst the endless tangle of pipes it once gave life to just outside.
Sitting up on the gas tower the other night with Maniac I spotted the 2 uniform chimneys in the distance and got thinking, few hours of research later I was 70% sure it was the 732MW Power plant mentioned in various articles. Promising MR a visit, I told him to prepare for Turbonz. I promised and I gave. Enjoy round 2
History
The site which is in Coryton Essex United Kingdom is run by Coryton Energy Ltd. It opened in 2002 and was built by Bechtel, is owned by Intergen, based in Burlington, Essex. MA USA, and cost £470 million.
It is a CCGT type power station that uses natural gas. It has two ABB Alstom GT26 gas turbines from which the exhaust gas leads to two heat recovery steam generators. These power one steam turbine. The station connects to the National Grid at the nearby 400 kV Coryton South substation.
The boiler design is a villager type. Optimised running in marginal markets is not possible due to these weaknesses.
Pictures
Tanlge of gas running passed the plant
Turbine hall
Turbine 1 is now gone but this is what remains (I think?)
Turbine 2
Turbine 3
Turbine 4 (Monster)
Turbine 5
Dunno what one is my fav... :S
Boiler Control room, again stripped but more interesting than the last one
Connecting Pipes etc.
The Caruthers 20t Gantry Crane