real time web analytics
Report - - Tytherington Tunnel - Gloucestershire Apr 19 | Industrial Sites | 28DaysLater.co.uk

Report - Tytherington Tunnel - Gloucestershire Apr 19

Hide this ad by donating or subscribing !

Bikin Glynn

28DL Regular User
Regular User
While I was in the west the other weekend (or extremely far in the east depending on how u look at it) I made the most of the day with 4 explores.
This place was No 2 on my list & I wasnt sure if it was worth looking at.
Iv done a lot of railway tunnels & this was by far the shortest & quite honestly one of the best.
The line served Tyrington quarry only & the first thing you notice is the incredible 1:56 incline as you walk through the rocky gully. I found myself looking for a rack & pinion system that didnt exist, there is noticeable kinks in the rails that I cant believe any conventional engine could deal with!

Once the line has levelled out you reach the tunnel itself which is a short affair appearing to of been mads specifically to cut under the M5, of course the reality is the small hill was tunnelled long before the motorway was built. Its quite surreal though being so close to the motorway but its relatively quiet bar the blackcaps singing in the tree lined banks.

The brick portals give a deception of things to come as these are merely 30ft long & the rest of the tunnel looks like it has been clawed through the rock by Gods hand himself!
There was a lot of water ingress which has created some lovely flowstone & small stalactites have begun to form. With the natural feel to the tunnel & the track still being present this was an enjoyable explore.

The tunnel was completed in 1872 & was in use till 2012. Strangely this was said to of been reopened in 2017 when Hanson took over but there was no evidence that anything had been on the tracks for quite some time.

Anyway here's the pics!

The Kinky track incline!
40714807653_93dc2a2df4_b.jpg



West Portal
40714810143_ae7fecb00a_b.jpg



33803538298_90a1ca01c1_b.jpg



46765013335_816ed904e0_b.jpg



U would assume this means half way ... but they were all the way through lol
33803535408_a6762f6d97_b.jpg



Flowstone!
33803533918_167e8a0f50_b.jpg



Portal bricked in when M5 was built although I cant figure why it was needed in such a short tunnel?
33803537018_81041474e9_b.jpg



33803538758_b336f8dcd0_b.jpg



Lovely patterns in ceiling
33803535998_2e41efea8b_b.jpg



33803533528_a6690899d8_b.jpg



33803537168_e32505a559_b.jpg



33803541988_cfb3356a4d_b.jpg
 

Seffy

Moderator
Staff member
Moderator
Did you go into the quarry though? That’s better than the tunnel!
 

Seffy

Moderator
Staff member
Moderator
No I wasnt sure how much of it was still live. saw the cctv on the main building so that was far enough as I had a busy day lined up ;-)

It’s kinda split into three sections with tunnels under the rock to each side section from the middle bit which is live. From the tunnel you can go up the bank to one side and have free roam in there easily!
 

Who has read this thread (Total: 224) View details

Top