Bowman, Thompson & Co. originally owned the site, but it was sold to Brunner Mond in 1990. With a seven year closure the site was reconstructed, afterwards producing sixty tonnes of soda ash a day. This figure later rose to 800 tonnes a day in 1926, with all of the Brunner Mond assets then being turned over to ICI.

The coal fired power station was decommissioned in 2000 when E.ON built their new Combined Heat & Power plant at Winnington. There are plans for the station to be demolished and a new Sustainable Energy Plant to be built on the site.

I was busted here on my last attempt the other year and have always meant to have another look. Having seen it doing the rounds recently I couldn't miss what may be one of the last opportunities, as it looks as though work for the new plant is perhaps finally being started.

Lostock Power Station, Northwich 1.JPG
Lostock Power Station, Northwich 2.JPG
Lostock Power Station, Northwich 3.JPG
Lostock Power Station, Northwich 4.JPG
Lostock Power Station, Northwich 5.JPG
Lostock Power Station, Northwich 6.JPG
Lostock Power Station, Northwich 7.JPG
Lostock Power Station, Northwich 8.JPG
Lostock Power Station, Northwich 9.JPG
Lostock Power Station, Northwich 10.JPG
Lostock Power Station, Northwich 11.JPG
Lostock Power Station, Northwich 12.JPG
Lostock Power Station, Northwich 13.JPG
Lostock Power Station, Northwich 14.JPG
Lostock Power Station, Northwich 15.JPG
 

Who has read this thread (Total: 261) View details

Top